{"id":688,"date":"2015-02-20T00:00:00","date_gmt":"2015-02-20T08:00:00","guid":{"rendered":"http:\/\/tmcfinancing.wpengine.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/"},"modified":"2021-05-10T20:28:54","modified_gmt":"2021-05-11T03:28:54","slug":"tmc-financing-funds-solar-powered-distribution-center-in-nevada","status":"publish","type":"post","link":"https:\/\/www.tmcfinancing.com\/es\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/","title":{"rendered":"TMC Financing financia un centro de distribuci\u00f3n de energ\u00eda solar en Nevada"},"content":{"rendered":"<div class=\"padding\">\n<div>20 de febrero de 2015<\/div>\n<h2 class=\"post\">TMC Financing financia un centro de distribuci\u00f3n de energ\u00eda solar en Nevada<\/h2>\n<p><i>Battery Systems utiliza la eficiencia energ\u00e9tica para desbloquear financiamiento ilimitado SBA 504<\/i><\/p>\n<p>TMC Financing anunci\u00f3 hoy que el propietario de Battery Systems, Inc. financi\u00f3 la construcci\u00f3n de un centro de distribuci\u00f3n energ\u00e9ticamente eficiente de 200,000 pies cuadrados en McCarran, Nevada, con un pr\u00e9stamo SBA 504 de tasa fija a 20 a\u00f1os. El nuevo almac\u00e9n est\u00e1 ubicado en un sitio de 12 acres en el Centro Industrial Tahoe Reno, que, con 165 millas cuadradas, es el parque industrial m\u00e1s grande de su tipo en los EE. UU. Y donde se est\u00e1 construyendo la Gigaf\u00e1brica de Tesla. El costo total del proyecto es $10.7 millones.<\/p>\n<p>&quot;Encontr\u00e9 esta \u00e1rea por accidente&quot;, dijo Brad Streelman, propietario y presidente de Battery Systems. \u201cTenemos un almac\u00e9n m\u00e1s peque\u00f1o en el \u00e1rea, pero este parque es asombroso. \u201cWal-Mart est\u00e1 aqu\u00ed. Amazon est\u00e1 aqu\u00ed. FedEx, PetSmart, Toys&#039;R&#039;Us ... lo que sea. Para la planta de Tesla, est\u00e1n ampliando la carretera hasta la autopista 50, por lo que tendremos acceso tanto a la autopista 50 como a la I-80, este y oeste &quot;.<\/p>\n<p>Ron Coomes, vicepresidente senior de desarrollo comercial de TMC Financing, dijo que las iniciativas de eficiencia energ\u00e9tica de la Administraci\u00f3n de Peque\u00f1as Empresas de EE. UU. Encajaban perfectamente con los sistemas de bater\u00edas. \u201cBrad ya ten\u00eda varios pr\u00e9stamos de la SBA, pero al ser ecol\u00f3gicos e instalar energ\u00eda solar pudimos desbloquear fondos 504 adicionales\u201d, dijo Coomes.<\/p>\n<p>&quot;Ron conoc\u00eda todos los entresijos y lo que se necesitaba&quot;, dijo Streelman. \u201cFue fundamental para guiarnos por el camino y en esta \u00e9poca, eso es lo que necesitas. Hay demasiadas reglas y regulaciones dif\u00edciles de entender para que un tipo como yo lo haga todo correctamente por mi cuenta. Yo ten\u00eda el terreno, as\u00ed que con un pr\u00e9stamo 504 no necesitaba aportar muchos fondos adicionales. Si no fuera por TMC, no habr\u00eda podido construir esto &quot;.<\/p>\n<p>Battery Systems, Inc. tiene 52 centros de distribuci\u00f3n al por mayor que atienden a los mercados locales en el oeste de EE. UU., Alaska y Hawai. Suministra bater\u00edas y accesorios automotrices, comerciales, recreativos y especiales directamente a los clientes. Se espera que el centro de distribuci\u00f3n cree 50 puestos de trabajo una vez que finalice la construcci\u00f3n en marzo.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>February 20th, 2015 TMC Financing funds solar-powered distribution center in Nevada Battery Systems uses energy efficiency to unlock unlimited SBA 504 financing TMC Financing today announced the owner of Battery&#8230;<\/p>","protected":false},"author":2,"featured_media":1718,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":""},"categories":[99,174,96,176,6],"tags":[],"class_list":["post-688","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-green","category-manufacturing","category-nevada","category-success-stories"],"acf":{"related_posts":null},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>TMC Financing funds solar-powered distribution center in Nevada | TMC Financing<\/title>\n<meta name=\"description\" content=\"TMC Financing today announced the owner of Battery Systems, Inc. financed the construction of a 200,000-square-foot, energy-efficient distribution center in McCarran, Nevada, with a 20-year, fixed-rate SBA 504 loan. The new warehouse is located on a 12-acre site in the Tahoe Reno Industrial Center, which, at 165 square miles, is the largest industrial park of its kind in the U.S. and where the Tesla Gigafactory is under construction. The total project cost is $10.7 million.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tmcfinancing.com\/es\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/\" \/>\n<meta property=\"og:locale\" content=\"es_MX\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TMC Financing funds solar-powered distribution center in Nevada\" \/>\n<meta property=\"og:description\" content=\"TMC Financing today announced the owner of Battery Systems, Inc. financed the construction of a 200,000-square-foot, energy-efficient distribution center in McCarran, Nevada, with a 20-year, fixed-rate SBA 504 loan. The new warehouse is located on a 12-acre site in the Tahoe Reno Industrial Center, which, at 165 square miles, is the largest industrial park of its kind in the U.S. and where the Tesla Gigafactory is under construction. The total project cost is $10.7 million.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.tmcfinancing.com\/es\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/\" \/>\n<meta property=\"og:site_name\" content=\"TMC Financing\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/TMC-Financing\/285163574849957\" \/>\n<meta property=\"article:published_time\" content=\"2015-02-20T08:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-11T03:28:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png\" \/>\n\t<meta property=\"og:image:width\" content=\"758\" \/>\n\t<meta property=\"og:image:height\" content=\"388\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"asblankproject\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@TMCFinance\" \/>\n<meta name=\"twitter:site\" content=\"@TMCFinance\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"asblankproject\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"TMC Financing funds solar-powered distribution center in Nevada | TMC Financing","description":"TMC Financing anunci\u00f3 hoy que el propietario de Battery Systems, Inc. financi\u00f3 la construcci\u00f3n de un centro de distribuci\u00f3n energ\u00e9ticamente eficiente de 200,000 pies cuadrados en McCarran, Nevada, con un pr\u00e9stamo SBA 504 de tasa fija a 20 a\u00f1os. El nuevo almac\u00e9n est\u00e1 ubicado en un sitio de 12 acres en el Centro Industrial Tahoe Reno, que, con 165 millas cuadradas, es el parque industrial m\u00e1s grande de su tipo en los EE. UU. Y donde se est\u00e1 construyendo la Gigaf\u00e1brica de Tesla. El costo total del proyecto es $10.7 millones.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tmcfinancing.com\/es\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/","og_locale":"es_MX","og_type":"article","og_title":"TMC Financing funds solar-powered distribution center in Nevada","og_description":"TMC Financing today announced the owner of Battery Systems, Inc. financed the construction of a 200,000-square-foot, energy-efficient distribution center in McCarran, Nevada, with a 20-year, fixed-rate SBA 504 loan. The new warehouse is located on a 12-acre site in the Tahoe Reno Industrial Center, which, at 165 square miles, is the largest industrial park of its kind in the U.S. and where the Tesla Gigafactory is under construction. The total project cost is $10.7 million.","og_url":"https:\/\/www.tmcfinancing.com\/es\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/","og_site_name":"TMC Financing","article_publisher":"http:\/\/www.facebook.com\/pages\/TMC-Financing\/285163574849957","article_published_time":"2015-02-20T08:00:00+00:00","article_modified_time":"2021-05-11T03:28:54+00:00","og_image":[{"width":758,"height":388,"url":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png","type":"image\/png"}],"author":"asblankproject","twitter_card":"summary_large_image","twitter_creator":"@TMCFinance","twitter_site":"@TMCFinance","twitter_misc":{"Escrito por":"asblankproject","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#article","isPartOf":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/"},"author":{"name":"asblankproject","@id":"https:\/\/www.tmcfinancing.com\/#\/schema\/person\/8ec29d74b49744faf1cde715701f7f26"},"headline":"TMC Financing funds solar-powered distribution center in Nevada","datePublished":"2015-02-20T08:00:00+00:00","dateModified":"2021-05-11T03:28:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/"},"wordCount":350,"commentCount":569,"publisher":{"@id":"https:\/\/www.tmcfinancing.com\/#organization"},"image":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png","articleSection":["Construction Projects","Energy Efficiency Projects","Industrial \/ Manufacturing \/ Warehouse","Nevada","Success Stories"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/","url":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/","name":"TMC Financing funds solar-powered distribution center in Nevada | TMC Financing","isPartOf":{"@id":"https:\/\/www.tmcfinancing.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#primaryimage"},"image":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png","datePublished":"2015-02-20T08:00:00+00:00","dateModified":"2021-05-11T03:28:54+00:00","description":"TMC Financing anunci\u00f3 hoy que el propietario de Battery Systems, Inc. financi\u00f3 la construcci\u00f3n de un centro de distribuci\u00f3n energ\u00e9ticamente eficiente de 200,000 pies cuadrados en McCarran, Nevada, con un pr\u00e9stamo SBA 504 de tasa fija a 20 a\u00f1os. El nuevo almac\u00e9n est\u00e1 ubicado en un sitio de 12 acres en el Centro Industrial Tahoe Reno, que, con 165 millas cuadradas, es el parque industrial m\u00e1s grande de su tipo en los EE. UU. Y donde se est\u00e1 construyendo la Gigaf\u00e1brica de Tesla. El costo total del proyecto es $10.7 millones.","breadcrumb":{"@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#primaryimage","url":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png","contentUrl":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/02\/Battery_Systems_Warehouse_finished.png","width":758,"height":388},{"@type":"BreadcrumbList","@id":"https:\/\/www.tmcfinancing.com\/tmc-financing-funds-solar-powered-distribution-center-in-nevada\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.tmcfinancing.com\/"},{"@type":"ListItem","position":2,"name":"Success Stories","item":"https:\/\/www.tmcfinancing.com\/category\/success-stories\/"},{"@type":"ListItem","position":3,"name":"Construction Projects","item":"https:\/\/www.tmcfinancing.com\/category\/success-stories\/construction\/"},{"@type":"ListItem","position":4,"name":"TMC Financing funds solar-powered distribution center in Nevada"}]},{"@type":"WebSite","@id":"https:\/\/www.tmcfinancing.com\/#website","url":"https:\/\/www.tmcfinancing.com\/","name":"Financiamiento TMC","description":"Prestamista No. 1 de la SBA 504 en la naci\u00f3n","publisher":{"@id":"https:\/\/www.tmcfinancing.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tmcfinancing.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.tmcfinancing.com\/#organization","name":"TMC Financing, Inc.","url":"https:\/\/www.tmcfinancing.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.tmcfinancing.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/08\/logo.png","contentUrl":"https:\/\/www.tmcfinancing.com\/wp-content\/uploads\/2015\/08\/logo.png","width":130,"height":133,"caption":"TMC Financing, Inc."},"image":{"@id":"https:\/\/www.tmcfinancing.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/TMC-Financing\/285163574849957","https:\/\/x.com\/TMCFinance","http:\/\/www.linkedin.com\/company\/57173","http:\/\/www.youtube.com\/user\/tmcfinancingTV"]},{"@type":"Person","@id":"https:\/\/www.tmcfinancing.com\/#\/schema\/person\/8ec29d74b49744faf1cde715701f7f26","name":"asblankproject","sameAs":["http:\/\/tmcfinancing.wpengine.com"],"url":"https:\/\/www.tmcfinancing.com\/es\/author\/asblankproject\/"}]}},"_links":{"self":[{"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/posts\/688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/comments?post=688"}],"version-history":[{"count":0,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/posts\/688\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/media\/1718"}],"wp:attachment":[{"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/media?parent=688"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/categories?post=688"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tmcfinancing.com\/es\/wp-json\/wp\/v2\/tags?post=688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}